Auto Save Baseline

1311972407_database_blue

Auto Save Baseline

$1,900

Auto Save Baseline Ensures decisions are made base on up to date information by automatically save baseline


Download Trial

In MS-Project 2010, Project Managers determine when to set baseline.
Unfortunately, for many organizations, this means that some data in the Project Server database is not comparable because MS-Project Users may forget to set baseline.
The consequence is that Executive decisions in the organization are made without up to date information. Such decisions could be costly for a business in terms of time, money and lost productivity.
Auto Save Baseline resolves that issue by allowing the Administrator (or anyone with admin permissions) to define when baseline should be set. Typically this is scheduled to occur overnight, although the frequency is configurable.
Auto Save Baseline works by selecting specific projects or all projects. 
Auto Save Baseline responsible for set baseline automatically at a specific time.
Features
Auto Save Baseline
Project Server 2007
Project Server 2010
 Configuration changes limited to administrators
 
 
 
 Ensures reporting are up to date
 
 
 Minimal configuration required
 
 
 Low maintenance overhead for users
 
 
 
 Quick and easy to install and configure
 
 
 
 Executives and PMOs don't need to chase MS-Project users for set baseline manually
 
 
 
Item
Price (USD)
Payment type
 
Auto Save Baseline
$1,900.00
One time
 
Annual Support and Upgrade Renewal for Auto Save Baseline
$380.00
Annual